Skip to content

EV charger installation cost

Prices checked

Typical installed cost

$1,750

Sourced installed range, not a quote

$950 to $2,500

EV charger installation cost for a Level 2 home charger, installed, has a typical figure of $1,750, within a sourced range of $950 to $2,500. The ranges on this page come from two sources, Angi and HomeGuide. A home whose electrical panel needs an upgrade pays more, and a permit adds a smaller amount. Use the figure as a starting budget, not a quote.

By job

Each row combines one range from each of the two sources. The first row covers a Level 2 charger with installation. The second row is installation labor only, for when you already have the charger. HomeGuide's figures are for a typical single-family home.

Job, installed costs
JobLowTypicalHigh
Level 2 charger, installed$950$1,750$2,500
Installation labor only$575$1,100$1,600

Price by job. The median rule combines the two supplied ranges, and typical is the median of the source midpoints.

See each source's figures
  • Level 2 charger, installed

    • Angi: $700 to $2,000. Updated September 23, 2026; accessed October 21, 2026. Level 2 totals include labor.
    • HomeGuide: $1,200 to $3,000. Updated October 19, 2025; accessed October 21, 2026. Level 2 charger plus installation for a typical single-family home.
  • Installation labor only

    • Angi: $400 to $1,200. Updated September 23, 2026; accessed October 21, 2026. Level 2 totals include labor.
    • HomeGuide: $750 to $2,000. Updated October 19, 2025; accessed October 21, 2026. Level 2 charger plus installation for a typical single-family home.

Panel upgrade and permit

Both sources price an electrical panel upgrade and a permit. A typical panel upgrade is $1,800 and a permit $150. Each is added in full when selected; check whether a quote already includes it.

Additional work costs
Additional workTypicalRangeApplies to
Electrical panel upgrade$1,800$1,300 to $2,250Level 2 charger, installed, Installation labor only
Permit$150$75 to $200Level 2 charger, installed, Installation labor only

Each item is added once when selected. Applies to lists the jobs it can be added to, not whether your job needs it.

See each source's figures
  • Electrical panel upgrade

    • Angi: $800 to $2,000. Updated September 23, 2026; accessed October 21, 2026. Level 2 totals include labor.
    • HomeGuide: $1,800 to $2,500. Updated October 19, 2025; accessed October 21, 2026. Level 2 charger plus installation for a typical single-family home.
  • Permit

    • Angi: $100 to $200. Updated September 23, 2026; accessed October 21, 2026. Level 2 totals include labor.
    • HomeGuide: $50 to $200. Updated October 19, 2025; accessed October 21, 2026. Level 2 charger plus installation for a typical single-family home.

Labor, other chargers and related work

New wiring, an electrical inspection and smart features can be priced separately. These single-source figures keep their original amounts and wording.

Labor

This is HomeGuide's electrician rate, shown for context. It is not added, because the ranges above already include labor.

Electrician
$50 to $130 per hour
Source: HomeGuide

Other charger levels

These chargers are not priced in the table. Each figure comes from one source.

Level 1 charger, installed
$0 to $900
Source: HomeGuide
Level 3 charger
$20,000 to $50,000
Source: HomeGuide

Related work

Each item is a separate price from one source. None is added to the estimate; ask whether a quote includes it.

Electrical inspection
$100 to $200
Source: HomeGuide
New wiring
$500 to $1,500
Source: Angi
Smart features
$200 to $600
Source: Angi

Estimate your charger

Choose the job and add a panel upgrade or permit if your home needs one. Area level picks a part of the sourced range; it is not a local price.

Job
Area level

This picks the lower, middle or upper part of the sourced range. It is not a local price.

Additional work

Typical estimate

$1,750

Estimated range, not a quote

$1,350 to $2,150

Assumptions

  • Installed base: Level 2 charger, installed, no size selected.
  • Average area level uses low-to-typical and typical-to-high midpoints as bounds, with the sourced typical unchanged.
  • No applicable extras included.
  • Extras are added in full, and sourced installed ranges are treated as not including them.
  • Labor rows are informational only and are not added to installed costs.

Where these numbers come from

The ranges come from two sources, Angi and HomeGuide. Their dates and scope notes are shown below. The checked date records when the dataset was reviewed, not a promise that prices are unchanged.

The low and high are the medians of the published bounds. For two sources, the median is the mean of the pair. Typical is the median of the source midpoints. Derived figures round to twenty-five-dollar steps below a thousand dollars and fifty-dollar steps at or above it, with exact halves rounded up. The estimator selects its base bounds, adds applicable extras in full and rounds the final totals.

How we calculate

Questions people ask

What is a typical EV charger installation cost?

For a Level 2 charger, installed, the typical figure is $1,750, within $950 to $2,500.

How much is installation if I already have a charger?

Installation labor alone has a combined range of $575 to $1,600. HomeGuide gives an electrician rate of $50 to $130 per hour.

Will I need an electrical panel upgrade?

Some homes do, if the panel cannot carry the extra load. The combined range for an upgrade is $1,300 to $2,250. An electrician can confirm it.

Do I need a permit to install an EV charger?

Some areas require one. Both sources give a permit at $75 to $200, and HomeGuide gives an electrical inspection at $100 to $200. Check with your local building department.

What do slower and faster charger levels cost?

HomeGuide gives the slowest level, a plug-in charger, installed, at $0 to $900, and the fastest level, a DC fast charger, at $20,000 to $50,000. Both are listed with the other charger levels on this page.

Compare written quotes for the same charger and job, and ask whether wiring, a panel upgrade, a permit and inspection are included. Keep the source dates beside the comparison.

Related